Rubber Cost made in China  replacement parts  in Muscat Oman Kneader Machine with top quality

We – EPG Team the greatest gearbox & motors , couplings and gears factory in China with 5 different branches. For more information: Cellular/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778083988828

Rubber Kneader Device

one. CE, ISO9001: 2008 certification
2. PLC handle, substantial generation performance
three. Lower sound, high basic safety and practical
4. Aggressive cost
five. Trustworthy company

Software:

This Rubber Kneading Device is mainly utilised for plasticizing and mixing of organic rubber, synthetic rubber, reclaimed rubber and plastics, foaming plastics, and utilized in mixing of different the diploma materials.

 

Introduction:

1. Mixing Chamber
It consists of a “w” shape entire body and two facet boards made of large good quality metal plates by indicates of extrusion forming and welding, which are jacked to get the circulation of cooling water or steam. It is plated with challenging chrome on its inside partitions.

2. Standard Observe Pump
Timing injection pump to the sealing program on a typical injection of hydraulic oil, lubrication sealing effect.

three. Thermal Resistance (or thermal pair)
There is a plug-in thermal resistance or thermal few in middle segment of the base of the chamber to be linked to electrical program to examine and handle the mixing temperature.

four. Rotor
It is developed to the hollow blades of banbury type. The hollows are related with axial gap of rotor shaft utilized as cooling or heating passage. The top edges and the facet faces of blades are surface area welded with hard alloy and floor, then plated with difficult chrome and polished.

five. Cooling/heating Program
A widespread piping technique is adopted for both cooling or heating materials in mixing procedure. Through the method cooling h2o or steam is fed in 3 approaches to the cavities of the rotors blades, – the jackets of the mixing chamber and the leading ram.

6. Tilting Mechanism
It consists of a rotor with brake, cycloidal gear reducer, TP sort worm and worm equipment, etc. It is in a position to actuate the mixing chamber tilting by 140° Around the entrance rotors.

7. Dust Stop Unit
At the joint in between the best of mixing chamber and the cantilevered arm of the equipment frame, the dust sealing assembled with curved slotted partings are utilized for obtaining an excellent and trustworthy sealing function. The stop confront of the rotor is sealed by stop make contact with sealing with non oil-lubrication and it seals effectively and is put on-resistance and durable.

8. Main Driving Program
The component is created up with major motor, reducer, connecting gears. It realizes odd-pace rotation of rotors with running face 1 other.

nine. Pneumatic handle method
Pneumatic management method is managed by PLC order. A bi-directional air cylinder helps make the ram up or down. In scenario of the more than load happens when mixing chamber, the leading ram can be elevated routinely or manually if essential, so as to shield motor from overloading.

10. Electrical Manage Program
Imported PLC device and electric manage elements which are all imported goods or imported engineering products are adopted in the electrical management method as to raise handle trustworthiness.

11. Dust Sealing Unit
Mixing chamber catchy interface rack cantilever the oil dust seals and timing impact oiling dust, special composition, the use of copper resources, very good sealing performance, no leakage of the glue, powder leakage, do not pollute the environment, but also has simple servicing and prolonged provider life.

Parameter:
 

Product X(S)N-
3×32
X(S)N-
5×32
X(S)N-
10×32
X(S)N-
20×32
X(S)N-
25×32
X(S)N-
35×30
X(S)N-
55×30
X(S)N-
75×30
X(S)N-
110×30
X(S)N-
150×30
X(S)N-
200×30
Whole Quantity Of
Mixing Chamber(L)
8 fifteen 25 45 fifty five seventy five 125 170 250 325 440
Wor ept Volume Of
Mixing Chamer(L)
three 5 10 20 twenty five 35 fifty five seventy five a hundred and ten 150 two hundred
Driving
Motor Electricity(KW)
five.five 11 22 37 37 fifty five seventy five 110 185 220 280
Tilting Motor Energy(KW) .fifty five 1.one 1.one 1.five one.5 two.two two.2 four five.5 eleven 11
Tilting Angle(°) one hundred forty one hundred forty 140 one hundred forty a hundred and forty 140 one hundred forty one hundred forty one hundred forty 135 one hundred thirty five
Rotating Pace of Rotor(Entrance/Rear)
(r/min)
32/24.5 32/23.five 32/25 32/27 32/24.five thirty/24.5 32/24.5 32/24.five 32/24.five 30/24.5 30/24.5
Stress of Cooling Drinking water(MPA) .2-.4 .2-.four .2-.4 .2-.four .2-.four .3-.four .3-.four .3-.4 .3-.4 .3-.four .3-.four
General Dimension (LxWxH)(mm) 2000x
1000x
2220
1850x
1200x
2280
2450x
1650x
2350
2675x
1650x
2560
2675x
1650x
2560
3200x
1900x
2950
3230x
1927x
2958
3325x
2615x
3105
4075x
2712x
3580
4250x
2750x
4106
4250x
3400x
4215
Gross Excess weight(T) ~2 ~2.1 ~2.one ~four ~4.5 ~6.3 ~7.one ~9.5 ~14.9 ~19.5 ~22.5

FAQ
 
1. What does your manufacturing facility do concerning top quality control?
We pay out much more importance to high quality management from the quite starting to the finish of generation. Each machine will be entirely assembled and carefully tested prior to cargo.
 
2. What’s the device top quality promise?
Quality guarantee time is a single 12 months.We decide on entire world popular model elements to keep our device in perfect wor ept issue.
 
3. Are you capable to give installation and commissioning abroad?How prolonged time will it just take?
Sure, we can offer overseas provider and complex help but buyer wants to pay out for the price of the set up. Modest machine generally normally takes inside 2~3 days. Massive generation line typically takes about thirty times.
 
4. How can I ept you to supply the proper equipment as I requested?
We will definitely supply a good good quality equipment as we reviewed and confirmed in the purchase. The core of our business society is innovation,good quality,integrity and performance. Also we have experienced many great cooperation with entire world renowned rubber manufacturing producers.
If you come to our manufacturing facility, we can present the user about us.
 
five. How can we go to your side?
We are situated in HangZhou Town, ZheJiang province, China. The identify of airport is HangZhou liuting airport. We will pick up you at the airport.

Our Services
 
♦ Our engineers can style ept devices for customers and deliver them the drawing to confirm. We are often on the aspect of conserving your expense.
♦ In the method of generation, we will consider images and send out to buyers for their track the progress.
♦ Paperwork this sort of as pac ept record, industrial invoice, and monthly bill of lading and so forth. will be despatched following the supply.
♦ We could source free English basis DWG, set up drawing, person guidebook, servicing handbook and component drawing.
♦ We provide overseas engineer services and support to teach your personnel to run the machine.

                                                       Welcome your inquiry!

The use of authentic gear manufacturer’s (OEM) component quantities or emblems , e.g. CASE® and John Deere® are for reference functions only and for indicating item use and compatibility. Our firm and the detailed replacement areas contained herein are not sponsored, authorized, or manufactured by the OEM.

Rubber Cost made in China  replacement parts  in Muscat Oman Kneader Machine with top quality

Rubber Cost made in China  replacement parts  in Muscat Oman Kneader Machine with top quality